project01:Project

From Msc1
(Difference between revisions)
Jump to: navigation, search
(Architectural Qualities)
(Structural Integrity)
Line 23: Line 23:
  
 
==Structural Integrity==
 
==Structural Integrity==
 
Prototype #1 Cubicle
 
 
Prototype #2 Tensegrity
 
 
Prototype #3 Space structure
 
 
Unit Components
 
 
Construction Process
 
 
Robotic arms
 
  
 
==Renders==
 
==Renders==

Revision as of 22:40, 27 June 2012

Contents

Concept

P01 Concept diagram.jpg P01 Reconfigure.jpg

The Tool

P01 Robotic Arm.jpg

The System

P1 Surrounding Context.jpg P01 Robotic arm.jpg P01 All Functional.jpg 4. All Closed.jpg 6. Weekend.jpg P01 Monday - Friday.jpg P01 Project.jpg


P01 GF plans.jpg


P01 Plan 1F.jpg

Structural Integrity

Renders

Architectural Qualities

Semi Open spaces

Connection: Chao Interior spaces

Rent "Me"

Conclusion

Urban:

Rent "Me" Service to cater for contextual change.

Allows more optomization in response to context change.

allows more opportunities to occur after a contextual change.

New architecture intervention without Form or Permanence.

Architecture: Temporary Customised units

Large range of possible geometries

Catering for large range of needs and desires.

Deconstructive architecture (within a span of 24 hours)

Ineffective components of the system: Robotic arm; as a borrowed tool for large scale manipulation.

potential of Robotic arm becoming its own Structure. (self construction)

high complexity within the system;

P01 Future Change.jpg

Project Complexity

Complex Systems; Tensegrity Structures; Plug in Components; Urban Platforms; Robotic Arms;