project17:Prototype
(→Prototyping) |
(→Programming) |
||
Line 55: | Line 55: | ||
==Programming== | ==Programming== | ||
+ | It was a most important and time consuming part of this project prototype. The current file has 100 components which each components has 3 boxes, it means that 300 panels. obviously we need to have control over each panel apart from each component. Besides, we need to have a system which helps to arrange components through the rails according to the demands. | ||
[[file:project17_G1.jpg|400px]] | [[file:project17_G1.jpg|400px]] | ||
[[file:project17_G2.jpg|400px]] | [[file:project17_G2.jpg|400px]] | ||
Line 60: | Line 61: | ||
[[file:project17_G3.jpg|400px]] | [[file:project17_G3.jpg|400px]] | ||
[[file:project17_G4.jpg|400px]] | [[file:project17_G4.jpg|400px]] | ||
+ | |||
==Detailing== | ==Detailing== | ||
Revision as of 12:11, 10 May 2012
Contents |
Scenario
Mechanism
There are several components (100 components). Each component consists of three panels which are stick together by a kind of hinge. I have to mention that only the second and third panel stick together by means of a hinge. The joining point between first and second one is fix. Each panel has 400 centimeter height and 500 length and 50 centimeter width. There are 10 rails under the ground which are base for moving those panels on top of that. The length of the rail is about 80 meters so they (components) will be able to moving horizontally and form in different position. Sometimes come as an individual component and in some occasion couple of them as a long wall. Apart from that each panel will be able to come up and moving vertically besides that horizontally moving. As I explained earlier each component has three module or three levels. Each panel can comes up in 50 centimeter steps until each level. When it comes to the next level it will be able to fold from its hinges. As a result it has capability to make a kind of shelter or semi open spaces.
Rules
Positioning
There are Festival, Exhibition, Semi-open Spaces for recording, and in some cases for concerts. Besides, it is a park in the rest of times which provide an interactive environment to visit historical part of the NDSM wharf and enjoy walking through the water.
Festival & Exhibition, panels should be set before the festival by director of the program in related to the demands. Some short walls to show the posters, number of steps in order to seat and rest and finally couple of shelters based on climate change for group meeting and something like that.
Park, there are some panels and shelter to make shadow or preserve against rain besides that some steps in order to seating and resting. Furthermore, those panels which connected with land and water simultaneously can come up as a response to the person who walking on top of that. Each step one goes further it comes up more and more to make thin island through the water to walking.
Studio, making semi-open spaces or in some cases totally close room with different capacity depends on that performance.
Interactivity
Manually
In some cases panels should be managed manually. However it would be interactive in two parts in response to the climate circumstances and human demands. The project has a plan to use two different sensors to recognize climate changes and walking. In order to rainy or sunny day make a shelter and other part of the project the panels in response to the human coming up.
Automatically
Problems
Architectural Quality
Programming
It was a most important and time consuming part of this project prototype. The current file has 100 components which each components has 3 boxes, it means that 300 panels. obviously we need to have control over each panel apart from each component. Besides, we need to have a system which helps to arrange components through the rails according to the demands.
Detailing
Structure
Material
Prototyping
Sensors & Activators,
We need an actuator and two sensors.
Actuator,LAS4 series