project09:System Design

From Msc1
(Difference between revisions)
Jump to: navigation, search
Line 14: Line 14:
 
<br/>
 
<br/>
 
The system has two parts to it. Its external network. Its internal structure.<br/>
 
The system has two parts to it. Its external network. Its internal structure.<br/>
==External Network==<br/>
+
==External Network==
 
The network connections to the outside shows a comprehensive list of what the project depends on, and what values makes the project dependable in this newly constructed ecosystem. The links show how well it fits into the existing or the new ecosystem, not dependant on any other project critically. Rather, the skate-park would add value to the site through revenue, recognition and more site users. The diagram shows an win-win situation with each of the parties with vested interests in the project getting direct gain.  
 
The network connections to the outside shows a comprehensive list of what the project depends on, and what values makes the project dependable in this newly constructed ecosystem. The links show how well it fits into the existing or the new ecosystem, not dependant on any other project critically. Rather, the skate-park would add value to the site through revenue, recognition and more site users. The diagram shows an win-win situation with each of the parties with vested interests in the project getting direct gain.  
 
<br/>
 
<br/>
 
[[File:Project9 system design 2.jpg|840px]]
 
[[File:Project9 system design 2.jpg|840px]]

Revision as of 12:53, 14 March 2012

Backicon.jpg

Frontpage-icon.jpg


The system has two parts to it. Its external network. Its internal structure.

External Network

The network connections to the outside shows a comprehensive list of what the project depends on, and what values makes the project dependable in this newly constructed ecosystem. The links show how well it fits into the existing or the new ecosystem, not dependant on any other project critically. Rather, the skate-park would add value to the site through revenue, recognition and more site users. The diagram shows an win-win situation with each of the parties with vested interests in the project getting direct gain.
Project9 system design 2.jpg

Personal tools