project09:Physical Prototyping

From Msc1
(Difference between revisions)
Jump to: navigation, search
(Proposed Prototype)
 
(9 intermediate revisions by one user not shown)
Line 16: Line 16:
 
==Prototype #1==
 
==Prototype #1==
 
The first prototype was a test of the new tessellation pattern itself. A larger one, also dash-line cut to simulate a hinge, and out of thick paper, served as a prototype to simulate folding. Though the tessellation itself is found to work fine, unexpected reactions on occurred on folding various triangles. Stress was also observed in some places, which could be resolved by minor changes to the design. The various typologies of space through folding were also explored.
 
The first prototype was a test of the new tessellation pattern itself. A larger one, also dash-line cut to simulate a hinge, and out of thick paper, served as a prototype to simulate folding. Though the tessellation itself is found to work fine, unexpected reactions on occurred on folding various triangles. Stress was also observed in some places, which could be resolved by minor changes to the design. The various typologies of space through folding were also explored.
 +
<br/><br/>
 +
[[File:IMG 2247.JPG|640px]]
 
<br/>
 
<br/>
 +
''Tessellation study''
 +
<br/><br/>
 
[[File:P9A.jpg|840px]]
 
[[File:P9A.jpg|840px]]
 
<br/>
 
<br/>
<br/>
+
''Clockwise from top left: The climbing wall, The Hill, The picnic spot, The skate-park, The mountain, The BMX project''
<youtube width="650" height="400">GOgfrnyw2KY</youtube>
+
<br/><br/>
<br/>
+
 
 +
 
 
==Prototype #2==
 
==Prototype #2==
 
The second prototype was cut out of 2mm MDF, with prefabricated holes to tie in different formations. Further testing on the same is required. Fabrication of a better hinge for a physical simulation of the structure is the next step for this prototype.
 
The second prototype was cut out of 2mm MDF, with prefabricated holes to tie in different formations. Further testing on the same is required. Fabrication of a better hinge for a physical simulation of the structure is the next step for this prototype.
 +
<br/><br/>
 +
[[File:IMG 2244.JPG|640px]]
 
<br/>
 
<br/>
[[File:Project9 system design 1.jpg|840px]]
+
''Part model of landscape''
<br/>
+
<br/><br/>
 +
 
 
==Proposed Prototype==
 
==Proposed Prototype==
 
The proposed prototype for the project is similar to the initial idea, except that it is hung rather than controlled from the bottom. The reason for this is the ease of application in a scaled prototype, though the actual structure will have supports only from the ground up.
 
The proposed prototype for the project is similar to the initial idea, except that it is hung rather than controlled from the bottom. The reason for this is the ease of application in a scaled prototype, though the actual structure will have supports only from the ground up.
 +
<br/><br/>
 +
[[File:P9--Aa.jpg|640px]]
 +
<br/>
 +
''Proposed prototype''
 +
<br/><br/>
 +
[[File:1qxqx.jpg|840px]]

Latest revision as of 10:38, 29 June 2012

Backicon.jpg

Frontpage-icon.jpg


Prototype #1

The first prototype was a test of the new tessellation pattern itself. A larger one, also dash-line cut to simulate a hinge, and out of thick paper, served as a prototype to simulate folding. Though the tessellation itself is found to work fine, unexpected reactions on occurred on folding various triangles. Stress was also observed in some places, which could be resolved by minor changes to the design. The various typologies of space through folding were also explored.

IMG 2247.JPG
Tessellation study

P9A.jpg
Clockwise from top left: The climbing wall, The Hill, The picnic spot, The skate-park, The mountain, The BMX project


Prototype #2

The second prototype was cut out of 2mm MDF, with prefabricated holes to tie in different formations. Further testing on the same is required. Fabrication of a better hinge for a physical simulation of the structure is the next step for this prototype.

IMG 2244.JPG
Part model of landscape

Proposed Prototype

The proposed prototype for the project is similar to the initial idea, except that it is hung rather than controlled from the bottom. The reason for this is the ease of application in a scaled prototype, though the actual structure will have supports only from the ground up.

P9--Aa.jpg
Proposed prototype

1qxqx.jpg

Personal tools