project01:Site Images

From Msc1
Revision as of 03:29, 14 March 2012 by Max (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Site

Project01 Site image.jpg

there are three main axis of movement into the region around the site [image 1]. these axial movements are critial in connecting with the NDSM ecosystem entry and exit ports. the link to the dock can be seen as the most obvious connection; although too far away for physical connection; an axial connection can be established.

Pedestrian flow can be seen as a major aspect within the site; currently the site is used for carparking, which allows alot of public flow in towards NDSM; similarly the addition of functions around the site [image 2] will create new flows, between private , selected and public categories. this site's potential to mix these types of people can create new social inteventions, allowing a more open and more transparent NDSM [Image 3].

For Image diagrams click here: Images

Project01 Site.jpg Project01 Site2.jpg Project Site3.jpg